Consequential improvements in construction
Consequential improvements refer to energy efficiency improvements that are consequential to changes to a building, which are required by regulation 28 of the Building Regulations (guidance for which appears in Section 6 of Approved document L2B: Conservation of fuel and power in existing buildings other than dwellings) to make the whole building comply with Part L of the Building Regulations
The regulation relates to proposed works to existing buildings (other than dwellings) with a total useful floor area of over 1000m2, and include:
- An extension.
- Installation of new fixed building services (other than renewable energy generators).
- Increasing the capacity of fixed building services (other than renewable energy generators).
Where such works are proposed, additional consequential improvements will be required to the extent that the necessary improvements are technically, functionally and economically feasible.
In most circumstances, this means that the payback period for the consequential improvements required does not exceed 15 years (or less if the expected life of the building is less than 15 years).
Consequential improvements could include:
- Upgrading heating, cooling or air handling systems.
- Upgrading lighting systems.
- Installing energy metering.
- Upgrading thermal elements.
- Replacing windows.
- On-site energy generation.
- Applying measures proposed in a recommendations report accompanying an Energy Performance Certificate.
In the case of an extension, the regulation can be complied with if the value of consequential improvements is not less than 10% of the value of the principal works.
In the case of changes to fixed building services, the building fabric should be improved so that the energy consumption of the services is not excessive, and additional consequential improvements must be made as described in the list above. Improvements to the building fabric in this case do not count towards the value of the consequential improvements. NB This does not apply if the services capacity is increased to supply a new extension rather than to improve services to an exiting space.
For changes to fixed building services, improvements to the building fabric are considered technically, functionally and economically feasible where the existing thermal elements have a U-value lower than those set out in the approved document. In the case of cooling, both the U-values of thermal elements and the solar gains of windows are set out, and in the case of lighting, an effective lamp efficacy is set.
Once the works are complete, the building owner should be provided with sufficient information to operate the building efficiently. This can be done by preparing a building log book.
NB Proposals to extend requirements for consequential improvements to dwellings (as part of the introduction of the green deal) were finally dropped by Communities Secretary Eric Pickles at the end of 2012.
[edit] Related articles on Designing Buildings
- Building log book.
- Building Regulations.
- Energy efficiency of traditional buildings.
- Energy performance certificates.
- Energy targets.
- Environmental plan.
- Green Deal.
- Principal works.
- Sustainability.
- U-Value.
[edit] External references
- Approved document L2B: Conservation of fuel and power in existing buildings other than dwellings.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.